The Drywall & Framing Glossary: 100+ Terms, Defined the Way the Trade Uses Them
From abuse board to Z-furring - every term an estimator, PM or apprentice hits in drawings, specs and supplier catalogs. Written by working estimators, not copied from a dictionary.
A
- Abuse-Resistant Board
- Gypsum panel with a reinforced core and heavier face paper for corridors, schools and healthcare where walls take impact; specified where standard board would fail in service.
- Acoustical Sealant
- Non-hardening caulk applied at partition perimeters and penetrations to preserve an assembly's STC rating; skipping it can drop a tested wall by several points.
- Area Separation Wall (ASW)
- A 2-hour rated shaftliner wall between townhome units, built with H-studs and breakaway clips so one burning unit can collapse without pulling down its neighbor.
- ACT (Acoustical Ceiling Tile)
- Lay-in ceiling tile in an exposed tee grid; quantified by tile count, grid components, wall angle and hanger wire per ceiling type.
- Addendum
- A formal change to bid documents during the bid period; every addendum can move quantities, so takeoffs are revised to the documents of record.
B
- Backing
- Flat stock or plates inside a wall to anchor casework, rails, TVs and fixtures; miss it in the takeoff and someone opens finished walls later.
- Backer Rod
- Foam rod pressed into joints before sealant to control depth; counted by LF at sheathing transitions, tubs and control joints.
- Bid Leveling
- Comparing subcontractor bids against an independent quantity takeoff to find scope gaps instead of just price differences.
- Bill of Materials (BOM)
- The consolidated order list produced from a takeoff - items, dimensions and quantities in supplier-ready units.
- Bulkhead
- A framed and boarded ceiling drop, usually chasing ductwork or defining a space edge; framed, boarded and finished as its own condition.
- Butt Joint
- Where two non-tapered board ends meet; harder to finish flat than tapered joints, which is why layout minimizes them.
C
- C-H Stud
- The stud used in shaft wall systems, shaped to grip 1-inch shaftliner panels between drywall layers on the room side only.
- Cement Board
- Cementitious backer (Durock, HardieBacker) behind tile at wet areas; counted separately from gypsum because it prices and hangs differently.
- Control Joint
- A designed break in large drywall surfaces to absorb movement; typically required around 30 feet in walls and specified in details.
- Corner Bead
- Metal, vinyl or paper-faced angle protecting outside corners; counted by LF and converted to sticks.
- Cross Tee
- The short grid member spanning between main tees in suspended ceiling systems, both ACT and drywall grid.
- CSI Division 09
- The MasterFormat division holding finishes; drywall assemblies live mainly in 09 21 16 and 09 29 00.
D
- Deflection Track
- Top track with extended legs letting structure above move without loading the studs; required at decks and slabs, priced separately from standard track.
- Demising Wall
- The wall separating tenants or units; often rated for fire and sound, and often the most expensive partition type on the job.
- DensGlass
- Georgia-Pacific's glass-mat gypsum sheathing for exterior and pre-rock conditions; moisture and mold resistant, priced well above standard board.
- Drywall Grid
- Concealed suspension system (mains and tees) that gets boarded and finished - the skeleton of hard lids and drywall ceilings.
- Draft Stopping
- Material subdividing concealed attic and floor spaces to slow fire spread; a code scope that hides in sections, not plans.
- Durock
- USG's cement board brand; shorthand on many sets for any cementitious backer at tile.
E
- End Stud
- The stud terminating a wall run; every run gets one, which is why run count matters in framing math.
- Exclusions
- The proposal list stating what a bid does not cover; a professional takeoff makes exclusions deliberate instead of accidental.
- Expansion Joint
- Building-wide movement joint; where drywall crosses one, special trim and detailing apply.
F
- Fire Taping
- Level 1 finish - tape embedded in compound, no finish coats - required at rated assemblies in concealed spaces; inspected even where never seen.
- Firestopping
- Tested systems sealing joints and penetrations in rated construction: head-of-wall, pipes, conduits, perimeter containment - each to a listed system.
- FlameBlock
- LP's fire-rated OSB sheathing achieving ratings with fewer layers; appears in pre-rock and exterior conditions.
- FRP (Fiberglass Reinforced Panel)
- Washable wall panels over board in kitchens and washdown areas; counted with trims and adhesive.
- FRT (Fire-Retardant-Treated)
- Pressure-treated lumber/plywood for blocking where combustible material needs a flame-spread rating; costs multiples of untreated stock.
- Furring
- Channels or studs building a wall surface off concrete, masonry or existing construction; hat channel, Z-furring or studs flat.
- Flexible Track
- Curvable track for radius walls; a specialty item that must be counted, not improvised.
G
- Gauge
- Steel thickness designation - 25GA light interior through 16GA and heavier structural; mils are the modern equivalent (25GA≈18mil, 20GA≈33mil).
- Gypsum Association (GA)
- Industry body publishing GA-216 (application standards) and the GA-600 Fire Resistance Design Manual takeoffs reference.
- Green Board
- Legacy term for moisture-resistant board; modern MR board uses different tech but the name persists on drawings.
H
- Hat Channel
- Furring channel with a hat-shaped profile for leveling surfaces or furring masonry; also the rigid cousin of resilient channel.
- Head-of-Wall
- The joint where a rated wall meets the deck above; must accommodate deflection while maintaining the rating - a major firestopping line item.
- Hanger Wire
- Wire suspending ceiling grid from structure; counted by drop length and spacing with anchors.
- High Wall
- Any wall exceeding normal limiting heights, demanding heavier gauge, deeper studs or engineering - gyms, atriums, warehouses.
I
- ICRA
- Infection Control Risk Assessment - healthcare protocols dictating containment and phasing; a quantifiable scope on hospital work.
- Impact-Resistant Board
- Panel rated under ASTM C1629 for soft/hard body impact; classification levels appear in specs for corridors and gyms.
- In-Wall Blocking
- See Backing; the drawings' term varies but the scope is the same.
J
- J-Bead
- Trim finishing a board edge where it meets dissimilar material, J-shaped in section; counted by LF.
- J-Track
- The track receiving shaftliner panels at shaft wall perimeters and jambs.
- Jamb Stud
- Stud framing a door or window opening; typically doubled or heavier gauge, counted per opening.
- Joint Compound
- The mud - taping, all-purpose, lightweight and setting-type compounds, quantified by finish level and area.
K
- Kicker
- Diagonal brace stabilizing framing back to structure - soffits, high walls, furred walls; a real material and labor line.
- King Stud
- Full-height stud alongside jamb studs at openings.
- Knock-Down (KD) Frame
- Three-piece metal door frame installed after board; affects framing and board sequence at openings.
L
- Level 5 Finish
- Skim coat over the entire surface above Level 4; required at critical lighting and gloss paints, roughly doubling finishing effort.
- Light Gauge Steel Framing
- Cold-formed steel studs and track for non-structural (and some structural) framing - the drywall contractor's skeleton scope.
- Limiting Height
- Maximum wall height for a given stud size, gauge and spacing per deflection criteria; exceed it and the wall needs redesign.
- Liner Panel
- 1-inch Type X gypsum shaftliner used in shaft wall and ASW systems.
M
- Main Tee
- Primary suspension member in grid ceilings, hung from structure by wire.
- Mineral Wool
- Stone-fiber insulation for fire and acoustic performance; denser and pricier than fiberglass with far lower per-bag coverage.
- MR Board
- Moisture-resistant gypsum for wet-adjacent areas; distinct from cement board, which goes behind tile.
- MLF
- Thousand linear feet - the unit steel framing is often priced in.
- Mud Ring
- Slang for adjustable box extension; matters to drywall at deep double-layer assemblies.
N
- NLB (Non-Load-Bearing)
- Framing carrying only its own weight and finishes - most interior drywall framing.
- Nailer
- Wood or steel member installed to receive another trade's attachment; a backing scope by another name.
O
- O.C. (On Center)
- Spacing measured center to center - 16" o.c. studs, 24" o.c. channel; the number that drives framing quantities.
- One-Hour Wall
- Common shorthand for a 1-hour fire-rated assembly; the rating belongs to the tested assembly, not the board alone.
P
- Party Wall
- The rated, sound-controlled wall between dwelling units; multi-family's defining assembly.
- Perimeter Fire Containment
- Firestopping the gap between floor slab edge and curtain wall - safing insulation plus spray, a specialized scope.
- Plenum
- The space above a ceiling used for air return; plenum-rated requirements affect materials there.
- Prerock
- Board installed early behind tubs, at plumbing walls and above hard lids - first board on the job, on someone else's schedule.
- Punchout
- The factory hole in stud webs for services; also why our tally-mark logo reads as studs to framers.
- Putty Pad
- Intumescent pad wrapping electrical boxes in rated walls; counted per box.
Q
- Quantity Takeoff
- The measured extraction of material quantities from drawings - the product this entire site is about.
R
- RC-1 / Resilient Channel
- Spring-steel channel decoupling board from framing to boost STC; single-leg design, easily short-circuited by wrong screws, quantified by LF per assembly.
- Rated Assembly
- A wall or ceiling built exactly to a tested, listed design (UL, GA) achieving a fire rating; the listing governs every component.
- RCP (Reflected Ceiling Plan)
- The drawing showing ceilings as if mirrored on the floor - where ceiling scopes live.
- Rock
- Trade slang for gypsum board; 'rocking' is hanging it.
- RFI (Request for Information)
- The formal question to the design team; good takeoffs generate RFIs before bid instead of change orders after.
S
- SAB / SAFB (Sound Attenuation Fire Batts)
- Mineral fiber batts for acoustic (and fire) performance in partitions; specified by thickness, quantified per assembly.
- Safing
- Mineral wool packed at slab-edge gaps as part of perimeter fire containment.
- Scope Gap
- Work no one carried - discovered at bid leveling if you're lucky, at construction if you're not.
- Shaft Wall
- Rated wall system built from one side (shaftliner + C-H studs + face layers) enclosing elevators, stairs and chases.
- Shaftliner
- See Liner Panel.
- Sheathing
- Panels on the framing exterior - DensGlass, FlameBlock, plywood - the envelope edge of drywall scope.
- STC (Sound Transmission Class)
- Single-number acoustic rating of an assembly; multi-family and hotel specs set minimums that drive channel, batts and layers.
- Stick
- One piece of trim or bead at stock length; 'sticks' is how bead is ordered.
- Stud
- The vertical framing member; in this trade, cold-formed steel by web size and gauge.
T
- Taper
- The factory-thinned long edge of board that lets joints finish flat; also the finisher who tapes them.
- Track
- The horizontal channel receiving studs top and bottom; quantified separately from studs, with deflection track on its own lines.
- Type C Board
- Enhanced fire-rated gypsum outperforming Type X in some assemblies, especially ceilings; not interchangeable with X where the listing says C.
- Type X Board
- 5/8" fire-rated gypsum, the workhorse of rated assemblies.
- Tenant Improvement (TI)
- Fit-out of leased space; fast-cycle bidding where drywall is usually the biggest trade.
- Takeoff Sheet
- The organized quantity document a takeoff produces - per wall type, per floor, supplier-ready.
U
- UL Assembly
- A fire-rated design listed by UL (e.g., U419); drawings cite the number and the takeoff quantifies to it.
- Unit Matrix
- Multi-family method: takeoff each unit type once, extend by the unit count schedule.
V
- Vapor Retarder
- Membrane controlling moisture diffusion - poly or smart membranes like MemBrain - quantified by roll coverage where in drywall scope.
- Veneer Plaster
- Thin plaster over blueboard; a different finishing system occasionally specified in institutional work.
W
- Wall Angle
- Perimeter trim of suspended ceilings, L-shaped, counted by room perimeter.
- Wall Type Schedule
- The drawing legend defining every partition assembly - the single most important sheet in a drywall takeoff.
- Waste Factor
- The percentage added over net quantities for cuts and breakage - typically 7-15% for board, shown separately in honest takeoffs.
- Wet Wall
- Wall containing plumbing; triggers MR board, prerock and access considerations.
Z
- Z-Furring
- Z-profile channel attaching rigid insulation and board to masonry or concrete walls.
- Zip Strip
- Tear-away bead giving a clean caulk joint where board meets windows and dissimilar materials.
Missing a term you hit in a spec? Ask us - we add terms contractors actually search for.