K-12, higher education and early childhood - impact-rated corridors, gym high walls and auditorium acoustics quantified, with the prevailing wage breakdowns public work demands.
Once at bid day, where public openings expose every number, and again in service, where corridors full of students find every wall that should have been impact-rated. Education takeoffs need both precision and the paperwork: quantities per wall type plus the certified-payroll-ready labor structure that Davis-Bacon and state prevailing wage projects require.
Public bids fail on formalities: an alternate priced into base bid, a unit price missing, an allowance ignored. Our education takeoffs mirror the bid form - base bid, alternates and unit prices as separate deliverables - so your number drops into the form without surgery at 11 PM.
Renovation work in occupied schools compresses into summers and breaks. Where the phasing plan splits the work, our quantities split with it, so your crew loading and material staging match the calendar the district actually enforces.
We provide labor hour and classification breakdowns structured for prevailing wage bids; your rates and certified payroll process plug into them directly.
Always - each alternate is a separate quantity package matching the bid form language, never blended into base bid.
Yes - same building types, usually without the public bid formalities, which typically shortens turnaround.
Send the plans - firm quote in 2-4 hours, sector-fluent takeoff on your desk before the bid date.
Upload Your Plans