24–48 Hour Turnaround  |  Serving contractors in all 50 states
info@drywalltakeoffservices.com  •  +1 (332) 242-5480
Home / Firestopping Takeoff Services

Firestopping Takeoff Services: The Scope Everyone Forgets Until the Inspector Arrives

Head-of-wall joints by linear foot, penetration seals by count, perimeter fire containment by edge condition - measured to the listed systems your life safety drawings call out.

Get a Free Quote   See a Real Sample

Firestopping Is a Measurable Scope, So We Measure It

Plenty of drywall bids carry firestopping as an allowance and hope. Then the inspection walk happens, the joint system the drawings referenced turns out to need spray on both sides, and the allowance evaporates. Our firestopping estimating services turn the scope into quantities: every rated wall's head-of-wall condition measured by linear foot, every penetration type counted where the documents show them, every perimeter condition at the slab edge quantified per detail.

  • Head-of-wall fire joints by linear foot, per rating and deflection
  • Bottom-of-wall and wall-to-wall joints where assemblies require
  • Through-penetration firestop by type: pipe, conduit, cable, duct
  • Fire-rated putty pads at electrical boxes in rated walls
  • Perimeter fire containment at curtain wall and slab edges
  • Fire caulk, spray, sealant and mineral wool safing quantities
  • Listed system references carried on every line item
  • Smoke and acoustical sealant scopes kept on separate lines

Quantified to the Listed Systems

Firestopping only passes inspection when the installed condition matches a tested and listed system, so our takeoff references the systems your drawings call out and quantifies the materials those listings require. Where the documents are silent on the system, we quantify the conditions and flag the selection as an open item, so you can carry a qualified number instead of a blind one.

Who Orders This Takeoff

Drywall subcontractors who carry firestopping inside their package. Specialty firestop contractors bidding the scope standalone. GCs who need to know whether the sub numbers actually cover the rated construction on the job. Deliverables arrive in Excel, PDF or CSV within 24 to 48 hours standard, organized by floor and by rated wall type, with free revisions inside 48 hours.

Frequently Asked Questions

Can you count penetrations if the MEP drawings are not final?

Yes. We count what is shown, state the drawing revision we measured from, and update the counts when coordinated MEP documents land - a common approach on design-build work.

Do you separate smoke sealant from fire joint systems?

Yes. Smoke partitions and acoustical caulking are different products at different costs, so they are always carried on separate lines from rated joint systems.

Is perimeter fire containment part of a drywall scope?

It often lands there on curtain wall buildings. We quantify safing insulation and spray at the slab edge per detail so you can include it, exclude it, or price it as an alternate deliberately.

Send Your Plans. Get a Firm Quote in 2–4 Hours.

Standard delivery in 24-48 hours, rush available. Free revisions within 48 hours on every project.

Upload Your Plans
Bid date coming up? Firm quote in 2–4 hours • takeoff in 24–48.
Upload Plans