Shaftliner, C-H studs, J-track and rated shaft assemblies for stairs, elevators and chases, plus prerock at tubs and plumbing walls - the scopes that get installed first and forgotten in bids most often.
Prerock and shaft wall go in before the rest of your scope, on someone else's schedule: the plumber needs the prerock behind the tubs, the elevator installer needs the shaft closed. If your estimate buried these quantities inside the general board number, you will mobilize twice and eat the trips. We take them off separately so you can price the early mobilization, the different crew, and the different material honestly.
Shaft wall is a listed system, not a pile of parts. Panel type, stud spacing, face layers and fastening all come from the tested assembly on the life safety drawings. Our estimators quantify to the listing shown, and when the drawings reference an assembly the details contradict, we flag it in writing so you can RFI it before it becomes your problem at inspection.
On podium apartments and townhomes, area separation walls and party wall prerock drive the early schedule. On commercial towers, elevator and stair shafts do. We estimate both weekly. Quantities arrive organized by shaft, by building or by floor, in Excel, PDF or CSV, within 24 to 48 hours standard, revisions free within 48 hours.
Because it installs on a different schedule, usually with a smaller crew and extra mobilizations. Separate quantities let you price that reality instead of averaging it away.
Yes. Where the listed assembly requires mineral wool or batts in the cavity, it is quantified with the shaft wall so the system prices complete.
Yes. ASW shaftliner, H-studs, breakaway clips and cap details are quantified per party wall so multi-building projects order accurately.