Drywall Takeoff Case Studies
Real projects, measured by our estimators, with the quantities shown and the pricing left out.
Two drywall takeoffs, written up with the numbers from the delivered workbooks: what was measured, how, what the contractor received and what was left out. Each one links to a PDF of the real workbook with pricing removed.
122-Unit Apartment Building: Framing, Drywall, Pre-rock
Four stories, Type VA, R-2 over an S-2 garage. Light gauge framing, drywall hanging and finishes, pre-rock and shaftliner, set out in 16 deliveries.
3,056 numbered lines • 13,193 board sheets • 88,081 LF of studs
4,350 SF Medical Clinic Tenant Improvement
An outpatient clinic in an existing building: new partitions, restroom cement board, FRP janitor room, roll-on texture to match existing and patch and repair.
89 numbered lines • 10,367 SF of texture • 8 FRP panels
What Every Case Study Shows
- The scope as ordered: drywall only, drywall with metal stud framing, or the full package, and what was by others.
- How it was measured: the marked sheets in Bluebeam, the heights used and the rules for openings, waste and rounding.
- The numbers: board by type and size, framing by size and gauge, finish levels, trims and sealants, all from the workbook.
- The deliverables: screenshots of the workbook tabs and a link to the full PDF.
More Real Takeoffs
The sample takeoffs page has four workbooks as PDFs: the two projects above, a multifamily drywall, framing and insulation takeoff from Maine and a skilled nursing facility from California. The how to do a drywall takeoff guide shows the method behind all of them.
Case Study FAQs
Are these real projects?
Yes. Both case studies are projects our estimators measured in 2026. The numbers come straight from the delivered workbooks; project names, street addresses, the town and the design team are left out, and the state is shown.
Can I see the full takeoff?
Yes. Each case study links to a PDF of the delivered workbook with pricing removed, and the sample page has two more takeoffs from Maine and California.
Can you take off a project like mine?
Send the plans and tick the scope. A project manager emails a fixed price within 2-4 business hours; most takeoffs are delivered in 24-48 hours and full commercial and multifamily sets in 3-5 business days.
Want a Takeoff Like These?
Fixed quote in 2-4 business hours. Most takeoffs in 24-48 hours. Starting from $150 per project.
Upload Your Plans