New-build hotels and brand-standard renovations - guestroom matrices, STC-rated demising, corridor lids and the lobby's Level 5 walls, each priced at what it actually costs.
Every hotel is two projects wearing one address: repetitive guestroom floors where a unit matrix nails quantities fast, and public space - lobby, F&B, ballroom, fitness - where every wall is custom, finishes climb to Level 5, and ceiling design gets ambitious. Estimating both with the same average is how hotel bids go wrong. We takeoff them as what they are.
Marriott, Hilton and Hyatt design standards drive assemblies the drawings sometimes under-document - acoustic ratings, corridor finishes, moisture protection at bathroom pods. Where the brand standard and the drawings disagree, we flag it, because the difference is your change order or your margin depending on who catches it first.
Property improvement plans run on occupancy math - phased floors, night work, protection scopes. Our renovation takeoffs quantify demo, new work and patching per phase so your pricing matches how the job will actually run.
Yes - we price DD sets with stated assumptions per brand standards, then reconcile when CDs land, giving your GMP a defensible quantity basis.
Yes. Pod-built projects shift scope boundaries significantly; we quantify what remains site-built and state the pod interface assumptions in writing.
Typical select-service hotels run 3-5 business days; large full-service properties are scoped at quoting. Rush support available during active bid periods.
Send the plans - firm quote in 2-4 hours, sector-fluent takeoff on your desk before the bid date.
Upload Your Plans